The University of St Andrews

Boiler House, Eden Campus

External Building Fabric Repairs

Following a competitive tender bid, we were delighted to be appointed to carry out external building fabric repairs to the Boiler House on behalf of the University of St Andrews.  The building is located within former Guardbridge papermill site, now named Eden Campus, Guardbridge.

The site comprises a large square shape industrial building constructed with masonry elevations and both flat and pitched roofs. The works to return the building to a weather tight condition included:

Enabling Works

Leveling of the surrounding grounds to allow a full height loadbearing, bespoke designed scaffold to be erected around the entire perimeter of the building.

Flat Roof Works

Preparation works to the existing flat roof including scarifying the existing gravel covering, removal of all debris and vegetation, removal of as much of the existing flagpole base as possible without damaging the roof structure and pin the existing wall head concrete coping stones; Installation of a new flat roof covering and capping system to the wall head coping; Installation of galvanized steel edge protection rail around the entire flat roof; Removal of existing corroded and condemned access ladder and installation of a new galvanized steel hooped access ladder.

Pitched Roof Works

Carefully remove vegetation from gutters and roof lights, previous window cleaning timbers and vertical steel support posts and vents in the galbestos roof as per the tender specification; Remove and replace all cracked, broken or damaged Georgian wired glazed rooflights, replacing the glazing putty and mullion flashings to fix in place permanently; Thoroughly clean all rooflights to remove algae, moss and general staining from external surfaces only; Supply and fit sacrificial steel mesh to allow safe access to the fragile galbestos roof surface; Install new valley and parapet gutter as per the tender specification; Install new roofing system including all guttering, capping, verge and vents as per the tender specification; Install cladding system to the Louvers of the roof as per the tender specification; Install roof edge protection to the end of the valley gutter to allow future clearance and maintenance activities.

Façade Treatments

Remove existing and install new downpipes and hoppers; Carefully cut away the redundant face fixed pipework to all elevations and make good the underlying brickwork; Supply and wedge in place Foamalux to the external face of the windows to the elevations; Thoroughly prepare all existing exposed metal work present to the elevations, taking corroded sections back to bare metal and paint all surfaces. Undertake Flexcrete specialist concrete window cill and lintel repairs ; Cleaning, repointing and repairs to brickwork; Repairs to structural brickwork; Decoration to external joinery; Fix in place perforated steel plates to the personnel entrance doors to prevent unauthorized access; Permanently seal these doors following the contract works to seal in the asbestos.

Our client was delighted with our project management and the finished product.

External Building Fabric Repairs

Client Lead Consultant Sector
The University of St Andrews Avison Young Education
Duration Principal Contractor Value
31 Weeks Cosmos Projects £1.13m

Let's get started

Contact us about this service

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Your World Matters to Us.

Integrated Management Systems

Cosmos Projects Ltd recognises that quality, health, safety and environmental matters are key to maintaining customer satisfaction and we recognise our role in ensuring a safe and healthy working environment for both our customers and our employees.

Avison Young have worked closely with Cosmos Projects on various types of contracts for over seven years now.

Both our clients and our in-house Avison Young Building Consultancy team are happy with the Cosmos Projects team’s project management skills and with their general approach and quality achieved on each project.

Recent projects carried out on our behalf for the University of St Andrews have involved multi-disciplinary trades on challenging sites which regularly remain occupied during the works. These works are always carried out to a high standard, on time and with minimal disruption to our clients and to the building occupiers.

We remain very happy to consider Cosmos Projects for future work. What is very helpful to Avison Young is the excellent estimating and also the post contract QS input from Cosmos which makes cost management very simple to manage for us in any contract administration roles.

Murray Watson — Director, Avison Young

Planet Decorators recently completed taping and decoration works at our second floor office refurbishment project in Castle Terrace, Edinburgh. Our client was absolutely delighted with the quality of the finished job. We look forward to working with John and his team again on future projects.

Marcus Roy - Project Manager, Woodhouse Contracts Ltd

We are delighted with our experience of working with Cosmos Projects over the duration of recent projects. We have found Cosmos Project’s team to be refreshingly co-operative and attentive and have a solution-based approach on their outlook to projects. Having worked previously with the management staff, this, we feel assisted with a team approach. Under the direction of Chris McNeill, Cosmos Projects bring a level of client side understanding that, we feel, sets them apart from others, and makes them a contractor of choice when considering tender lists. We would have no hesitation in recommending Cosmos Projects.

Craig Murdoch — Director of Surveying, Ramsay McMichael Consulting Ltd

I worked with Cosmos on the internal and external refurbishment of a Grade ‘B’ listed townhouse in Glasgow city centre. The work included extensive internal improvements to services and finishes to provide speculative office space for let. We collaborated with Cosmos following a competitive tender process and value engineered the project scope and specification in line with our client’s budget requirements.

Colin Wilson — Director Trident Building Consultancy

Cookie Policy

Find out more about how this website uses cookies to enhance your browsing experience.

Back to top